N
InsightHorizon Digest

What is TCH on an approach plate

Author

John Thompson

Updated on April 15, 2026

Threshold Crossing Height (TCH): The theoretical height above the runway threshold at which the aircraft’s glide slope antenna would be if the aircraft maintains the trajectory established by the mean ILS glide slope or MLS glide path.

What does TCH stand for in aviation?

Threshold Crossing Height (TCH) related to PAPI siting ensures that aircraft have a certain landing gear clearance over the runway threshold.

What is lightning bolt on approach plate?

A “lightning bolt,” or “zig-zags” centered amid an airway or a route indicates that the airway or route is not drawn to scale. A lightning bolt on the profile view of an instrument approach procedure (IAP) indicates a precision final approach fix (PFAF).

What are the five sections of an approach plate?

The instrument approach chart is divided into six main sections, which include the margin identification, pilot briefing (and notes), plan view, profile view, landing minimums, and airport diagram.

What is threshold crossing height?

Threshold Crossing Height Defined [FAA Pilot/Controller Glossary, PCG, 8/22/13] THRESHOLD CROSSING HEIGHT− The theoretical height above the runway threshold at which the aircraft’s glideslope antenna would be if the aircraft maintains the trajectory established by the mean ILS glideslope or MLS glide path.

What is a circling approach?

A circling approach is the visual phase of an instrument approach to bring an aircraft into position for landing on a runway which is not suitably located for a straight-in approach. (

What is a type certificate holder?

A type certificate holder who allows a person to use the type certificate to manufacture a new aircraft, aircraft engine, or propeller must provide that person with a written licensing agreement acceptable to the FAA.

What is RNAV approach?

The RNAV approach is a non-precision-based method, which implies an approach that uses a course deviation guidance method yet does not include details about the glide line. For orientation and spatial knowledge, the RNAV approach uses GPS or LORAN horizontal guidance. It flies much like a VOR or a VOR / DME approach.

Where is MDA on approach plate?

To find MDA or DA, you’ll look to the Minimums section toward the bottom of the chart. Under the minimums, you will see different lines of minimums you can fly (this will depend on the type of equipment you have onboard) and whether they correspond to a Decision Altitude or a Minimum Descent Altitude.

What are the 4 segments of an approach?

An instrument approach may be divided into as many as four approach segments: initial, intermediate, final, and missed approach.

Article first time published on

What is IAF and FAF?

As you might suspect, the initial segment begins at an Initial Approach Fix (IAF), an intermediate segment at an Intermediate Fix (IF) , and the final segment at a Final Approach Fix (FAF).

Is DME required for ILS?

No, a DME is not required for all ILS approaches; however, there are some ILS/DME approaches that require it. Normally it’s because they have an arc or the distance is needed to locate a fix on the approach.

What does A5 on approach plate mean?

The circle with the A5 indicates that the MALSR approach light system is installed. The reverse video (white on a black background) means that the approach lights are pilot controlled. The dot above the circle indicates that there is a sequenced flasher installed (this is sometimes called the rabbit).

What is the difference between DA and MDA?

Yet, decision altitude (DA) and minimum descent altitude (MDA) are very different concepts. As the names suggest, DA is a decision point while MDA is the lowest altitude allowed without visuals.

Does an ILS have a FAF?

There is no FAF on an ILS approach. There is a final approach point, indicated by a lightning stroke and coincident with glide slope intercept.

At which minimum height will the second climb segment end?

Second Segment – begins when the landing gear is fully retracted. Engines are at takeoff thrust and the flaps/slats are in the takeoff configuration. This segment ends at the higher of 400′ or specified acceleration altitude. In most cases, the second segment is the performance limiting segment of the climb.

What is threshold crossing?

Crossing of thresholds is a highly symbolic act, such as in the rites of passage of transition to adulthood or the carrying of a bride by a husband over the threshold of their first house. It indicates commitment and change, leaving behind the old and accepting the new.

What is screen height?

The height above the ground of an imaginary screen that the aircraft would just clear when taking off or landing, in an unbanked attitude and with the landing gear extended. For takeoff and landing, this is normally 35 ft. Some definitions take it as 50 ft.

What is a type certificated product?

A type certificate (TC) is issued to signify the airworthiness of the approved design or “type” of an aircraft to be manufactured. The TC is issued by a regulatory authority, and once issued, the design cannot be changed unless at least part of the process for certification is repeated to cover the changes.

What is the difference between FAR 23 and FAR 25?

Part 23 is for Normal Category airplanes, and Part 25 is for Transport Category airplanes. Transport Category means airplanes above a certain limit in passenger capacity or gross weight (the exact limit depends on the type of airplane).

Who is TC holder?

The TC holder is the entity that the responsible CAA communicates with on design matters such as ADs. Next, we examine the OEM. For most aircraft or aircraft parts, the OEM is also the TC holder. In many cases, the TC holder has moved onto new designs and no longer wants to make and sell parts for an ageing aircraft.

Can you land straight in on a circling approach?

Circling-only approaches do not allow a straight in approach so you will only see circling minima. … The Instrument Procedures Handbook explains the reasons for building circle to land only approaches: The final approach course alignment with the runway centerline exceeds 30°.

Can you circle off an ILS approach?

Just like a VOR, RNAV, or LOC approach, you can circle to land from an ILS approach using glideslope as a navigation aid. Many ILS approaches contain circling minimums, and they’re a great way to get below the clouds in order to land on a more suitable runway.

How do you go missed off of a circling approach?

The Aeronautical Information Manual tells us that if we are required to make a missed approach after starting the circle, we should always make an initial turn toward the landing runway and then to continue that turn until established on the missed approach course.

Why do we add 50 feet to MDA?

Most ATOs add 50 feet to the MDA to take into account the inertia of the aircraft, but this is an SOP item not a regulatory requirement. Some ATOs will add 50 feet to a precision DA for PEC (pressure error correction) unless the AFM states a different PEC.

Is MDA AGL or MSL?

All approach minimum altitudes, whether MDA or DA, are expressed in both MSL and AGL altitudes. As stated above, DA is read from the altimeter…it gives you the direct answer to “when do I reach minimum altitude?” in flight.

Is ILS a precision approach?

Definition. Instrument Landing System (ILS) is defined as a precision runway approach aid based on two radio beams which together provide pilots with both vertical and horizontal guidance during an approach to land.

Is IFR an RNAV?

Area navigation (RNAV, usually pronounced as /ˈɑːrnæv/ “ar-nav”) is a method of instrument flight rules (IFR) navigation that allows an aircraft to choose any course within a network of navigation beacons, rather than navigate directly to and from the beacons.

What makes an approach a precision approach?

A precision approach is an instrument approach and landing using precision lateral and vertical guidance with minima as determined by the category of operation. … The controller uses the PAR display to guide the pilot or flight crew through the final stages of landing, providing horizontal and vertical guidance.

What is if IAF?

The Initial Approach Fix (IAF) is the point where the initial approach segment of an instrument approach begins. … The initial approach fix may be collocated with the intermediate fix (IF) of the instrument approach and in such case they designate the beginning of the intermediate segment of the approach.

What is initial approach segment?

The initial approach segment is the segment of an instrument approach procedure between the initial approach fix (IAF) and the intermediate fix (IF). … In the initial approach segment, the aircraft has left the en-route structure and it is entering the Instrument approach procedure.